Wednesday, August 8, 2012

New playground going up Saturday

  After many months of planning and site prepping, it's finally time to put up the new playground equipment in St. Patrick Park.
  This Saturday, August 11th, many hands and borrowed tools will begin the work about 8:00 a.m.  Anyone and everyone is welcome to join us. 
  Our preschool teacher, Mrs. Peggy Goltz, has been working hard on this project and sent out the following message last week:

Dear Families,
As you’ve read and may have heard we will be installing a new preschool playground on August 11th beginning at 8:00am.  We would love some help with this project not only for our preschoolers but also for our community.  It is a wonderful project for all the children of Anamosa.  Along with labor we will need hardware.  If you can not help us with installation but have any of the below listed tools that you’d be willing to lend to the installation team it would be greatly appreciated.  If you can come over and help please bring some of the below tools to make our job as easy and fluent as possible.
 
1.     Hammer Drill
2.     Heavy duty extention cords/generator
3.     String line and stakes
4.     Saw horses
5.     Levels: (2) 9” magnetic torpedo levels and (1) 4” carpenter’s level
6.     Tape measures 25’ and (2) or more 100’
7.     Open ended wrench set
8.     Allen wrenches or hex keys
9.     Sockets sets (we will be needing these for several pieces of equipment.)
10. Screwdrivers of various sizes
11. Drift pins
12. Box Knife or utility knives
13. C-clamps and vice grips
14. Electric Drills with various sized drill bits (and extra batteries/chargers)
15. Impact wrench (optional; need extreme caution w/ this to avoid damaging parts)
16. Hammers: Standard and Rubber mallets
17. Wooden stakes and moving strapes
18. S hook pliers for closing S hooks on swimgs
19. Jacks, or blocks to mechanically suspend components while concrete sets.
20. Hand-held grinder
21. 4” cut-off wheel
22. Tap & die set: 5/6”, 3/8”, ½”, 7/16”, 5/8”, etc.
23. Bolt Cutter, 24”
24. Tech screwdriver – 5amp, 2000 RPM optimum
25. 12-15 Mechanically-inclined adult volunteers and helpers.
If you can help in anyway with this project either with tools or man power please email Peggy Goltz <pgoltz@stpat-anamosa.pvt.k12.ia.us> as she will be collaboration a list of tools and help.  Thank you so much!!
 
 
  The purpose of the new playground is to provide a safe environment for the preschool age children and  give them more options for the kind of play that helps with development.  St. Patrick preschool currently rates 5  out of 5 stars on the state rating system and the new playground will help keep this level of quality.   The funding for the playground comes from the state  grant for preschool programs.
  Members of the St. Pat's PTO will be providing lunch for the workers about noon.  Hope to see you Saturday!
 
 
 